BRANCH

Warehouse & Logistics

Services

Electrical engineering

LOCATION

Altenmarkt, Salzburg

CONSTRUCTED AREA

approx. 7,000 m²

ORDER VOLUME

approx. 1 million €

AUSTRIAN QUALITY FOR ONE OF THE MOST SUCCESSFUL SKI PRODUCERS

On the factory premises of the Atomic ski factory in Altenmarkt, the logistics area was expanded by a total of 7,000. m² of floor space. The miniload warehouse is a fully automatic high-bay warehouse with a height of 24 metres. Jungheinrich built the entire racking system with an electrical connection capacity of 800KW.

ELECTRICAL INSTALLATION INCL. LOW CURRENT FOR A SMOOTH LOGISTICS PROCESS

Furthermore, the AC supply for a 100KWp PV system is produced. G. Klampfer Elektroanlagen GmbH was commissioned with the entire electrical installation.

The overall contract therefore included the following areas: LVS, power installation, lighting, security lighting, IT cabling & video, BMA, ELA, lightning protection, MSP system.